Development of the road from Bidyabil Bazar to Karangicherra BOP Camp from Ch. 0.00 Km to 0.75 Km L 1.50 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III, Re carpeting, Seal coat, Protection work etc. Gr 1
Chief Engineer, PWD (R and B) › SE, PWD (R and B), Second Circle › EE Khowai Division