Hiring of One number air conditioned Car with engine capacity up to 1150 CC for petrol version for the Chief Chemist, STPS, MPPGCL, Sarni on monthly run basis for 2000 KM per month for a period of 24 months.
Madhya Pradesh Power Generating Company Limited › Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL