IHQ of MoD (Army)-(OSCC) › Eastern Comd-IHQ of MoD (Army)-(OSCC) › CORPS 1-Eastern Comd-IHQ of MoD (Army)-(OSCC) › DIV A-CORPS1-Eastern Comd-IHQ of MoD

CONSTRUCTION OF MONPA GATE BDY WALL AND WAITING SHED AT CHETTRI WAR MEMORIAL

8h leftRef 4C/SAD/26-27/71/158
Save this opportunity for your team

Key details

Tender value
₹39.00 L
EMD
₹1.17 L
Tender fee
Nil
Category
Works
Sector
infrastructure
Service category
civil_works
Product category
Construction Works
Tender type
Limited
Form of contract
Works
Period of work
180 days
Bid validity
180 days
Location
CHETTRI WAR MEMORIAL
District
Not published
State
Arunachal Pradesh
Pincode
790104

Dates

Published
12 Sept 2026, 09:00 am
Document download from
12 Sept 2026, 09:00 am
Document download until
22 Sept 2026, 09:00 am
Bid submission from
12 Sept 2026, 09:00 am
Bid submission closes
22 Sept 2026, 09:00 am
Bid opening
22 Sept 2026, 05:00 pm
Pre-bid meeting
Not published
Pre-bid meeting place
Not published

All times as published by the source portal (IST). Always confirm against the official notice before relying on a deadline.

Bid documents

  • Tendernotice_1.pdfNIT167.32 KB
  • rfp.pdfRFP17214.02 KB
  • BOQ_884400.xlsBOQ312 KB

Document names come from the portal's own manifest. We do not redistribute the files here. Download them from the official portal, or sign in and have them ingested and analysed for a tender you are pursuing.

Source

This notice was collected from DRDO. The captured direct link may expire, so use the official portal search if it does not open.

The direct tender link is not verified as permanent. Use the portal search and paste 4C/SAD/26-27/71/158.

Upcoming tender list

Upcoming tenders in Arunachal Pradesh

Related live notices are shown after the tender details so titles, dates, value and references stay readable.

View all
2.
constructionOpen TenderRW/NH215/NH(O)/Tender/26-27/01LiveArunachal Pradesh

Strengthening work from km 115.670 to km 133.936 length 18.266km and specialized slope protection works at km 133.94 and km 150.737 on Changlang-Khonsa road section of NH 215 under Khonsa Highway Division in the State of Arunachal Pradesh

End date 22 Sept, 01:00 pm · 12h leftPublished 17 Aug, 11:00 amValue  ₹74.54 CrEMD  ₹74.54 L

Ministry of Road Transport and Highways › NER and SARDP-NE - MoRTH › RO Itanagar - MoRTH

8 documents listed · not yet fetchedAIIMS Delhi
3.
constructionOpen TenderRW/NH215/NH(O)/Tender/26-27/01LiveArunachal Pradesh

Strengthening work from km 115.670 to km 133.936 length 18.266km and specialized slope protection works at km 133.94 and km 150.737 on Changlang-Khonsa road section of NH 215 under Khonsa Highway Division in the State of Arunachal Pradesh

End date 22 Sept, 01:00 pm · 12h leftPublished 17 Aug, 11:00 amValue  ₹74.54 CrEMD  ₹74.54 L

Ministry of Road Transport and Highways › NER and SARDP-NE - MoRTH › RO Itanagar - MoRTH

8 documents listed · not yet fetchedCentral Public Procurement Portal
4.
constructionOpen TenderRW/NH215/NH(O)/Tender/26-27/01LiveArunachal Pradesh

Strengthening work from km 115.670 to km 133.936 length 18.266km and specialized slope protection works at km 133.94 and km 150.737 on Changlang-Khonsa road section of NH 215 under Khonsa Highway Division in the State of Arunachal Pradesh

End date 22 Sept, 01:00 pm · 12h leftPublished 17 Aug, 11:00 amValue  ₹74.54 CrEMD  ₹74.54 L

Ministry of Road Transport and Highways › NER and SARDP-NE - MoRTH › RO Itanagar - MoRTH

8 documents listed · not yet fetchedIIT Delhi
5.
constructionOpen TenderRW/NH215/NH(O)/Tender/26-27/01LiveArunachal Pradesh

Strengthening work from km 115.670 to km 133.936 length 18.266km and specialized slope protection works at km 133.94 and km 150.737 on Changlang-Khonsa road section of NH 215 under Khonsa Highway Division in the State of Arunachal Pradesh

End date 22 Sept, 01:00 pm · 12h leftPublished 17 Aug, 11:00 amValue  ₹74.54 CrEMD  ₹74.54 L

Ministry of Road Transport and Highways › NER and SARDP-NE - MoRTH › RO Itanagar - MoRTH

8 documents listed · not yet fetchedIndian Institute of Science