Directorate of Local Bodies UP › Gorakhpur Municipal Corporation

Construction of CC road from Kalyan Mandapam to the house of Jokhan Singh and construction of RCC drain up to Hadawa Phatak Main Road in Ward No. 80, Rapti Nagar.

2h leftRef NCAP_2nd_ward 80
Save this opportunity for your team

Key details

Tender value
Not disclosed by the department
EMD
₹1.11 L
Tender fee
₹5,900
Category
Works
Sector
infrastructure
Service category
civil_works
Product category
Civil Works
Tender type
Open Tender
Form of contract
Percentage
Period of work
Not published
Bid validity
90 days
Location
Gorakhpur
District
Gorakhpur
State
Uttar Pradesh
Pincode
273001

Dates

Published
25 Sept 2026, 09:00 am
Document download from
25 Sept 2026, 09:00 am
Document download until
2 Oct 2026, 05:00 pm
Bid submission from
25 Sept 2026, 09:00 am
Bid submission closes
2 Oct 2026, 05:00 pm
Bid opening
3 Oct 2026, 11:00 am
Pre-bid meeting
Not published
Pre-bid meeting place
Not published

All times as published by the source portal (IST). Always confirm against the official notice before relying on a deadline.

Bid documents

  • Tendernotice_1.pdfDoc3076.07 KB
  • d.pdfDoc3057.81 KB
  • BOQ_2241657.xlsboq303.5 KB

Document names come from the portal's own manifest. We do not redistribute the files here. Download them from the official portal, or sign in and have them ingested and analysed for a tender you are pursuing.

Source

This notice was collected from Uttar Pradesh eProcurement. The captured direct link may expire, so use the official portal search if it does not open.

The direct tender link is not verified as permanent. Use the portal search and paste NCAP_2nd_ward 80.

Upcoming tender list

Upcoming tenders in Uttar Pradesh

Related live notices are shown after the tender details so titles, dates, value and references stay readable.

View all
3.
ServicesLimitedNTPC/USSC-CPG3/9900333468LiveUttar Pradesh

JOB CONTRACT FOR REPLACEMENT OF TOP STOP ASSEMBLY INCLUDING LOCKING GEAR RACK ARM AND TOP GIRDER OF WAGON TIPPLER TP 193 AND REPLACEMENT OF SPUR GEAR SHAFT ASSEMBLY INCLUDING ERECTION OF SPUR WHEEL ALIGNMENT TESTING AND COMMISSIONING OF WAGON TIPP

End date 2 Oct, 03:30 pm · Closing within the hourPublished 16 Sept, 05:00 pmValue  Not disclosedEMD  Nil

NTPC Limited › Corporate Centre › USSC › CPG-3

3 documents listed · not yet fetchedNTPC Limited