SR works for sewer line and storm water drainage system, repair of the damaged compound wall at the rear side of the hospital, and separation of effluents from OT and laboratory areas with diversion to ETP at ESIC Model Hospital, Kollam.
Employees State Insurance Corporation › R.O. Kerala › Construction Branch